I am the Dorset Area Group Organiser for the 3mm Society. The reason for choosing 3mm is that I can do some real modelling without the distraction of Ready to run models. At present I have a 3mm layout, Hennock, which has been exhibited several times. It is also booked for several shows in the future. Currently I am building another 3mm Layout-Teignford. Please mail me if you have a similar interest,query or wish to convert to 3mm.
Pages
▼
Wednesday, July 22, 2015
Branchlines Lyme Regis stock.
Another kit built coach from Colin- where does he get all this time? A Branchlines kit except for the roof which I can't remember the parentage of- no doubt I will be reminded.
Monday, July 20, 2015
Saturday, July 18, 2015
Swanage-July Group Meeting-2015
Swanage now has its own storage facility!
It has now been decided to use Peco Hom track as there is too much work to do on the original- shame but rebuilding exiting points will take too long and we really want to get this rolling.
It has now been decided to use Peco Hom track as there is too much work to do on the original- shame but rebuilding exiting points will take too long and we really want to get this rolling.
Thursday, July 16, 2015
New Hornby Class 700 0-6-0
Yes-Yes, I know this is 4mm but I have one of
these to build so this seems the ideal way to help
building.
Plus it is a lovely little engine, just right for the 4mm version of East Boldre.
Just three parts to add, the tender brake gear, front vacuum pipe and the front coupling.
Must add crew and headcode plus coal and it's ready.
Impetus to build the 3mm version now.
these to build so this seems the ideal way to help
building.
Plus it is a lovely little engine, just right for the 4mm version of East Boldre.
Just three parts to add, the tender brake gear, front vacuum pipe and the front coupling.
Must add crew and headcode plus coal and it's ready.
Impetus to build the 3mm version now.