Pages

Monday, September 30, 2013

Worsley Bulleid Brake 3rd- Second Build.

 The sides are bent up and tack soldered- this is the piece that the body sides are located around.
The solebar still attached to the etch- The third pip from each end had to be removed due to it fouling the fold up braces.
 The solebar secured in place- usually I tack each end then when happy with squareness solder the rest of the pips.

The trusses have now been folded down and secured to the solebars- note that it was necessary on this coach only to release the ends and solder them on- not still attached to the fold- for some reason they wer bowed if still left attached.

No comments:

Post a Comment