I am the Dorset Area Group Organiser for the 3mm Society. The reason for choosing 3mm is that I can do some real modelling without the distraction of Ready to run models. At present I have a 3mm layout, Hennock, which has been exhibited several times. It is also booked for several shows in the future. Currently I am building another 3mm Layout-Teignford. Please mail me if you have a similar interest,query or wish to convert to 3mm.
Pages
▼
Wednesday, October 02, 2013
Toplight Coach.
Time to do the detailing- the corridor connections, buffers and bogie sideframes have all been fitted.
Attention then turns to the roof. Using Comet Models excellent downloads, these give the location of the roof vents etc.
The rainstrips are easy this time as the roof is plastic so it is a case of Mek being used to glue them in place.
The underframe is next to be detailed so must find all the bits for that!
No comments:
Post a Comment