Her we have four coach chassis ready for the interior and final assembly.
Two of each have sprung bogies and two have solid ones, as supplied by 3SMR. The longer, 60ft chassis has 9ft bogies, the rest are 57ft and have 7 ft bogies.
They are made from Worsley Works etchings and the 60 footer has frames from the 3mm Society B Set. The fold down frame is too long for this version, doing so will foul the bogies.
ll that is neede is to fit couplings to these and assemble and they are finished. Time for a new project-Loriat, Permanent Way Brake Van are the next to be completed.
Two of each have sprung bogies and two have solid ones, as supplied by 3SMR. The longer, 60ft chassis has 9ft bogies, the rest are 57ft and have 7 ft bogies.
They are made from Worsley Works etchings and the 60 footer has frames from the 3mm Society B Set. The fold down frame is too long for this version, doing so will foul the bogies.
ll that is neede is to fit couplings to these and assemble and they are finished. Time for a new project-Loriat, Permanent Way Brake Van are the next to be completed.
No comments:
Post a Comment