The next stage is to produce and fit the boiler.
This is simply a 13mm brass tube sourced from my local model shop- this one specialises in radio control aeroplanes but keeps a good stock of general modelling supplies.
Once cut to length, the area around the motor/gearbox needs to be cut away. Once this has been done the whole thing is aligned and the boiler soldered into place.
In hindsight, it would have been easier to thread a bolt through and tighten a nut to hold it all together in line- but as they say hindsight is a wonderful thing.
Now theboiler is attached, the body can be assembled onto the footplate.
One thing with this kit is that ,being etched in nickle silver, it does solder together well and the fit has been exact so far and looking at the rest I have no reason to doubt that the rest will also fit.
So on to the body next!
Hennock
The Degree Inn
14XX and Autocoach
Hennock Track Plan
Thursday, May 09, 2013
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment