Because of one of our senior members having to move, his 3mm Layout-Deverton- has to be disposed of.
This excellent layout has appeared several times in Mixed Traffic in the 2010 editions.
The layout consists of three boards, 6mm ply on softwood framing, totalling 3500 mm x 600mm. The layout is fully wired with connectors between the boards and control panel. The track is Gem flexi (12mm Gauge) with fibre based points laid on cork and fully ballasted.
There is a built in transformer wired to a removable control panel with power and point motor (H&M) switches mounted in a track diagram. There are no hidden sidings - they are needed for both ends.
The layout will need to be removed from its shelving brackets plus fluorescent light fittings on a valance.
Several buildings will accompany the layout if required plus a stock of trees for yet to be developed areas.
The layout has to be removed by mid May from North Kent so some urgency if Delverton is to be saved.
A great opportunity to aquire a quality non completed layout.
Layout now sold.
This excellent layout has appeared several times in Mixed Traffic in the 2010 editions.
The layout consists of three boards, 6mm ply on softwood framing, totalling 3500 mm x 600mm. The layout is fully wired with connectors between the boards and control panel. The track is Gem flexi (12mm Gauge) with fibre based points laid on cork and fully ballasted.
There is a built in transformer wired to a removable control panel with power and point motor (H&M) switches mounted in a track diagram. There are no hidden sidings - they are needed for both ends.
The layout will need to be removed from its shelving brackets plus fluorescent light fittings on a valance.
Several buildings will accompany the layout if required plus a stock of trees for yet to be developed areas.
The layout has to be removed by mid May from North Kent so some urgency if Delverton is to be saved.
A great opportunity to aquire a quality non completed layout.
Layout now sold.
No comments:
Post a Comment