Having a rare hour to kill, I thought that it was time I stuck the roof on the Signalbox.
But- no interior detail had been fitted although it isn't possible to see as the back faces those viewing.
So a piece of channel-plastic- had a dozen holes drilled in it, and some plastic rod stuck in these with MEK. Then some black plasticard to make the shelf and some offcuts to give a suggestion of instruments and an hour is up.
Just got to paint the levers and the instruments and the'box roof can be securely fitted.
Hennock
The Degree Inn
14XX and Autocoach
Hennock Track Plan
Sunday, October 20, 2013
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment