As a result of showing the groups newly aquired layout on the blog, I have had some more information.
I was contacted by Geoff Gay who told me that the layout had been built by Gerry Nicklin.
I then recieved a call from Gerry who is pleased that the layout is to be refurbished. He recalled the reason that the layout was donated to the Swanage Railway together with appropriate stock.
It is very satisfying to have recieved this information and now we can give the credit to the originator.
I hope that the group can refurbish to the excellent standards of the original.
Hennock
The Degree Inn
14XX and Autocoach
Hennock Track Plan
Friday, July 19, 2013
Subscribe to:
Post Comments (Atom)
1 comment:
I will do my best with the engine shed. Perhaps we could find out what materials were used Steve
Post a Comment